8 June 2026
Building the new shelter house
The shelter was built for twenty animals. We currently have more than forty.
So this winter we started building a new house: insulated, with separate kennels for the dogs and a warm room for the cats.
This page is updated every time there is something new to show.
Updates
30 August 2026
Roof finished
The roof is on. It is dry inside, so the animals will be warm this winter.
Still to do:
- windows
- heating
- kennels
7 August 2026
Walls up
The walls are standing. Next is the roof, which we hope to close before the rains.
8 July 2026
Foundation poured
The concrete is poured and cured for two weeks. Thank you to everyone who helped.